Validation Begins with the Product Configuration

A custom EV PDU cannot be evaluated only by comparing nominal voltage and current. The validation scope should reflect the electrical architecture, component configuration, operating conditions, packaging, interfaces and vehicle environment.

Before requesting evidence, confirm which configuration it applies to and whether test conditions represent the intended application.

Configuration Identification

The validation record should identify the product configuration and revision, topology and branch arrangement, principal components, connector, busbar and enclosure configuration, control hardware or interface version where applicable, drawings, specifications and acceptance criteria. Evidence from a different configuration should not automatically be treated as evidence for the current project.

Electrical Operating Conditions

  • Minimum, nominal and maximum system voltage.
  • Continuous and peak current by branch, including peak duration and duty cycle.
  • Simultaneous branch loading and switching sequence.
  • Available fault-current and protection assumptions.
  • Charging, propulsion and auxiliary-load operating modes.

Insulation and Dielectric Requirements

Define applicable insulation and dielectric requirements, test points, methods, environmental conditions and acceptance limits for the product voltage class, architecture and customer requirements. A generic test category is not evidence without the configuration, method, conditions and result.

Current-Carrying and Temperature-Rise Conditions

Temperature-rise assessment depends on current, duration, duty cycle, conductor and terminal system, enclosure, ambient temperature and cooling conditions.

  • Branch and main-circuit currents and test duration.
  • Ambient conditions, measurement locations and stabilization criteria.
  • Simultaneous-load assumptions and applicable acceptance limits.

Protection and Pre-Charge Functions

Where included in the agreed assembly, confirm responsibility boundaries for main and branch protection, contactor switching, pre-charge sequence, service disconnects, status feedback, HVIL and isolation-monitoring interfaces where applicable. A function in one reference design does not make it standard in every PDU.

Control, Mechanical and Environmental Interfaces

For controlled PDUs, define CAN, LIN or discrete interfaces, message responsibilities, timing, fault handling, diagnostics and acceptance method. Mechanical and environmental review may include dimensions, mounting, connector retention, cable routing, ingress protection, vibration, shock and temperature as required by the vehicle program. The customer and supplier should identify applicable methods, sample quantities and acceptance criteria for the project.

Prototype, Design and Production Evidence

Distinguish engineering prototype checks, design-verification evidence, customer or vehicle-level validation, production inspection and end-of-line records, and change-control or traceability records. These stages serve different purposes; a prototype functional check does not replace the agreed design or production validation scope.

Recommended RFQ Package

For an efficient review, provide the vehicle architecture, voltage window, number of high-voltage outputs, continuous and peak current for each output, load map, required protection and pre-charge functions, interfaces, packaging and environmental constraints, project stage and quantity context.