Project-Specific Engineering for High-Voltage Distribution Assemblies
Shenzhen Terui Huateng New Energy Co., Ltd. (TRHT New Energy) designs and manufactures project-specific high-voltage power distribution assemblies for electric vehicles and battery energy storage systems.
Each project is reviewed against the customer's electrical architecture, operating conditions, packaging constraints, interface requirements and agreed assembly scope. Product functions, ratings, components, verification activities and acceptance criteria are confirmed for the specific project.
1. Engineering Input Review
An initial review normally begins with available system information. Preliminary or unknown items may be marked as TBD and closed during project review.
- Application and vehicle or ESS architecture; system voltage window; continuous and peak current requirements.
- Number of high-voltage inputs and outputs; load and current requirement for each output; branch map and simultaneous operating conditions.
- Required contactors, fuses, pre-charge functions and service disconnects; control interfaces, communications and diagnostic boundaries.
- Connector, cable-exit and HVIL interface requirements where applicable; installation space, mounting and enclosure constraints.
- Environmental and ingress-protection requirements; project stage, prototype quantity and estimated production context.
2. Architecture and Assembly-Scope Review
TRHT reviews requested power-distribution functions against the system architecture. The agreed assembly may include high-voltage distribution, isolation and switching devices, overcurrent protection, pre-charge elements, sensing interfaces and project-specific control interfaces.
Applicable functions depend on the customer's architecture and the agreed division of responsibility between the battery system, PDU, BDU, BJB, charger, DC/DC converter, inverter, PCS and vehicle or ESS controller.
3. Component and Protection Review
Component selection is reviewed against available electrical and environmental inputs. Final component selection and protection coordination require confirmed system inputs. A reference platform or previous configuration does not automatically establish suitability for another application.
- Contactor voltage, current and switching conditions; fuse coordination and branch-protection requirements.
- Pre-charge topology and operating sequence; busbar, cable and connector current requirements.
- Creepage, clearance and insulation requirements; sensing and monitoring interfaces.
- Control voltage, CAN, LIN or discrete interfaces where required; thermal, packaging and service-access constraints.
4. Mechanical and Interface Definition
The enclosure, mounting arrangement, connector orientation and cable exits are reviewed against the available installation envelope. Project documentation may include an agreed interface definition, connector schedule, mounting information and other deliverables defined for the project stage. Changes to architecture, packaging, connector system or operating conditions may require renewed review.
5. Manufacturing and Inspection Planning
Manufacturing and inspection requirements are established for the approved product configuration. Applicable process plans, inspection points, traceability requirements and acceptance records are defined according to the agreed project and production stage.
6. Verification Scope and Acceptance Criteria
Verification is not a single fixed package for every product. Applicable activities, methods, conditions, sample quantities and acceptance criteria are defined against the product configuration and customer requirements. Depending on the project, review may address dimensional and visual inspection, continuity and functional checks, insulation and dielectric requirements, current-carrying and temperature-rise conditions, ingress protection, environmental and vibration requirements, control-interface checks, and identification or traceability records.
These categories do not mean every test is included in every project or has been completed for a specific product. The agreed verification plan and available evidence should be confirmed during project review.
7. From Initial Review to Production Planning
A typical project flow is to receive available system inputs; identify missing information and technical risks; define preliminary electrical and mechanical scope; confirm components, interfaces and responsibility boundaries; review prototype and verification requirements; freeze the agreed configuration and acceptance criteria; then plan production and inspection for the approved scope.
Start an Engineering Review
For an initial review, share the application, voltage window, continuous and peak currents, number of high-voltage outputs, branch requirements, control interfaces, packaging constraints and project stage. Preliminary or unknown inputs may be marked as TBD.